Prof. Amy Lupin 9 Posted February 22 The captain has been quite busy of late, so he’s delegated one of his responsibilities to you. Each head of a division (eg. IT engineering, medical) writes logs throughout the day, both for record keeping and to keep the higher ups informed of any developments. The logs are also a way to highlight any requests – while they’ll typically get filtered through to the supplies officer, some of the less straightforward requests need to go through the captain as they have the final say. The captain typically goes through these logs individually and marks them as “acknowledged”, “more information requested”, “denied” accordingly. For this task, we’d like you to write 5 logs that might appear in the captain’s queue. Also mark each log as if the first mate has gone through them. The above examples are suggestions – you’re welcome to come up with your own actions. Post your logs and actions taken below by 23:59 HOL time on 28 February to earn 10 rubies. Share this post Link to post
River Fenwick 4 Posted February 26 1. Medical Division - Request for Additional Medical Supplies Log: We are running low on medical supplies, including painkillers, antiseptics, and surgical gloves. While we have enough for the short term, we won't have enough for the entire trip. Requesting approval to requisition additional stock from the supplies officer. Status: Acknowledged Comments: The request has been forwarded to the supplies officer for immediate processing. Please ensure that we track usage rates to prevent future shortages. 2. Engineering Division - Unauthorized Power Surge in Main Engine Log: During routine maintenance, a power surge was detected in the main engine, temporarily causing a system glitch. It appears to have resulted from faulty wiring in the control panel. Immediate repairs are underway, but this could indicate a more systemic issue requiring further investigation and requesting approval for a complete diagnostic scan and potential rerouting of power for safety. Status: More Information Requested Comments: Please provide a more detailed analysis of the cause and any potential risks. If it's critical, we may need to temporarily adjust the ship's power allocation. Awaiting your assessment. 3. IT Division - Request for System Upgrade Log: Our internal network has been experiencing slowdowns, especially with the increasing amount of data being processed. The servers operate near full capacity, and we foresee more strain in the coming months. We propose an upgrade to the server infrastructure, including the installation of additional RAM and storage. Estimate time for installation: 2 weeks. Status: Denied Comments: While we understand the importance of system upgrades, given the current budget constraints, this request must be reconsidered after further evaluation. Prioritize immediate performance fixes to stabilize the network for now. 4. Security Division - Need for Additional Crew Training Log: Over the last month, there have been a few security breaches, primarily due to untrained crew members unaware of emergency protocols. We want to propose a mandatory security training course for all non-security personnel. This will help improve safety and efficiency in handling critical incidents. Please approve the necessary resources. Status: Acknowledged Comments: This training is a priority, especially for new crew members. I will initiate coordination with the training department to schedule sessions. Ensure the security department prepares adequate materials. 5. Environmental Division - Disruption in Waste Processing System Log: A malfunction in the waste processing system has caused a temporary halt in recycling operations. This could lead to waste disposal delays and potential environmental hazards if not addressed quickly. The technician has identified the issue as a blockage in the filtration system, but the part required for repair is not in stock. We request approval to requisition the part from another ship. Status: More Information Requested Comments: Please provide an estimated timeline for when the part could be procured and the repair completed. If the environmental hazard risks are high, we may need to find an alternative solution while awaiting the part. Share this post Link to post
Scarlet Robloutain 0 Posted February 28 1. Engineering Division - Log Entry: "Routine maintenance completed on the main propulsion system. Noticed minor wear on the secondary coolant pump. Requesting replacement part to avoid potential issues during extended travel." - Action: Acknowledged 2. Medical Division - Log Entry: "Weekly health check-ups conducted. No major health concerns reported. However, we are running low on certain medical supplies, including antibiotics and pain relievers. Requesting restock at the next docking station." - Action: Acknowledged 3. IT Division - Log Entry: "System update successfully installed. However, there have been intermittent connectivity issues with the external communication array. Requesting permission to run a full diagnostic and potentially replace outdated components." - Action: More Information Requested 4. Science Division - Log Entry: "Collected samples from the asteroid belt for analysis. Preliminary results show high concentrations of rare minerals. Requesting additional lab equipment to conduct more detailed studies." - Action: Acknowledged 5. Security Division - Log Entry: "Increased security drills conducted in response to recent reports of pirate activity in the sector. Requesting additional security personnel and equipment to ensure the safety of the crew and cargo." - Action: Denied Share this post Link to post